Texas Instruments TPS7H2211EVM eFuse Evaluation Module (EVM)

Texas Instruments TPS7H2211EVM eFuse Evaluation Module (EVM) demonstrates the operation of a single TPS7H2211 eFuse space-enhanced product. The Texas Instruments TPS7H2211EVM provides footprints that can be populated with additional components for testing customized configurations, such as parallel or redundant eFuses.

Features

  • Flexible configuration options, including single- and parallel-device circuits
  • Customizable soft start, enable threshold, undervoltage threshold, and capacitance

Kit Contents

  • TPS7H2211EVM evaluation module
  • Evaluation kit user's guide

Board Layout

Mechanical Drawing - Texas Instruments TPS7H2211EVM eFuse Evaluation Module (EVM)
Published: 2023-09-01 | Updated: 2024-10-08